Roadmap
By quarter. Four labels. Nothing beyond Q2 2027.
Shipping means a customer can have it. Research track means it runs somewhere we control. Designed means the document exists and is being reviewed. Planned means we intend to, and that is all.
Q3 2026
- Research trackGuardian v0 on a bench rig
- DesignedFirewall method v0 drafted and sent for review
- ShippingFirst site agreement
Q4 2026
- ShippingGuardian installed at site 1
- ShippingFirst Water Statement accepted by an external party
- DesignedFirst envelope co-designed with a jurisdiction
- ShippingMethod published
Q1 2027
- ShippingGuardian at 3 sites
- Research trackNode skid fabrication
- Research trackWater OS at L1 on pilot data
Q2 2027
- Research trackNode running at a laboratory partner at L3
- PlannedTwin scenario library
- Research trackIndependent laboratory verification of Node output
Last updated 23 August 2026. Changes to this page are kept in version history.